Monday, November 5, 2007

INFRASTRUCTURE-Port Facility

INFRASTRUCTURE

Port Facility

SABANG PORT
NATURE CONDITION :
Geographycal Location 050-53’-00’LU/0950-19’-00’ BT
Port Status Public Port
Operational Status Efforted by PT. PELINDO
Grade of Port ADPEL Class of V Sabang
Guide Guide Free
Average of Rain Fall 244,3 Milimeters
SHIPPING LINE :
Length 1.400 meters
Wide 800 meters
Deepness to 53 meters
Base Land Sand Coral
PORT POOL :
Wide 177 Hectare
Minimum Deepness 8 meters
Maximal Deepness 35 meters
Port State Control ADPEL SABANG
Maximum Wave 0,5 meter
Minimum Wave
0,2 meter
Quay of Public
Construction Concrete
Length 32 meters
Wide 9,25 meters
Trestel (1)
Length 17 meters
Wide 5,25 meter
Deepness 7 - 12 M LWS
Condition 85 %
Quay of TNI AL
Construction Concrete
Length 180 meters
Length Inter Dolphin 7 meters
Wide 7 meters
Deepness 7-12 meters
Condition 85 %
Facility Capacities of freshwater
Quay of Pertamina
Construction Concrete
Length 35 meters
Length Inter Dolphin 7 meters
Wide 7 meters
Trestel (1)
Deepness 5 meters
Condition 7-9 meters
Quay of PT. PSB
Construction Concrete
Length 6 meters
Wide 6 meters
Deepness 12 meters
Condition
65 %
Quay of Dept. Sea and Fishery
Construction Concrete
Length 10 meters
Wide 5 meters
Deepness 2 - 5 meters
Condition 100 %
Quay of Navigasi
Construction Concrete
Length 40 meters
Wide 8 meters
Trestel (1)
Length 32 meters
Wide 6 meters
Deepness s/d 15 meters
Condition 90 %
PORT OF PASSENGGER IN BALOHAN
Construction Concrete
Gang Away 155 meters
3 Units of Dholpin 40 meters
Operational Building 400 square meters
Condition 85 %